Development of Building Information Modelling Model for Residential Housing in Enhancing the Maintenance Work

Authors

  • Nur’Ain Idris Department of Civil Engineering, Centre for Diploma Studies, Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, 84600 Muar, Johor, Malaysia
  • Muhammad Arif Muhammad Hafiz Saw Department of Civil Engineering, Centre for Diploma Studies, Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, 84600 Muar, Johor, Malaysia
  • Nurkhairinna Adilah Mohamad Hairi Department of Civil Engineering, Centre for Diploma Studies, Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, 84600 Muar, Johor, Malaysia
  • Ain Syazana Setia Department of Civil Engineering, Centre for Diploma Studies, Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, 84600 Muar, Johor, Malaysia
  • Hamidun Mohd Noh Department of Construction Management, Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, Parit Raja, 86400 Batu Pahat, Johor, Malaysia
  • Khairi Supar Department of Civil Engineering, Centre for Diploma Studies, Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, 84600 Muar, Johor, Malaysia
  • Noorul Hudai Abdullah Department of Civil Engineering, Centre for Diploma Studies, Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, 84600 Muar, Johor, Malaysia
  • Siti Masturah Rahman Faculty of Civil Engineering and Built Environment, Universiti Tun Hussein Onn Malaysia, Parit Raja, 86400 Batu Pahat, Johor, Malaysia
  • Rahmita Sari Rafdinal PS Construction Co. Ltd., Tokyo Shiodome Building, 1-9-1, Higashi Shimbashi, Minato-ku, 105-7365 Tokyo, Japan

DOI:

https://doi.org/10.37934/ard.142.1.136151

Keywords:

BIM system, Building information modelling, Revit software, semi-detached house, conventional vs BIM

Abstract

Building Information Modelling (BIM) is a digital model of a building that can be visualized in 3D physical form and contains various geometric information, functions, features, or parameters generated by various related software. The main goal of this study is to develop a BIM architecture and structure drawing of semi-detached house for maintenance purposes. Clients, developers, and contractors can use BIM as a resource when executing maintenance projects. There is few software can use to develop BIM system. Contractors around the world use a variety of BIM software, including AutoCAD, Navisworks, Data CAD, and others to develop BIM in software. In order to develop BIM system in this study, Revit software has been chosen to create a semi-detached house. Between the conventional method and the BIM method, there is difference. BIM is allowing different design teams to collaborate more easily by using a "live" version of the building model compared to conventional method which is working in storage facilities and taking snapshots. Getting a house plan from a developer is the first step in build BIM. The drawing needs to be converted from a PDF file to AutoCAD format. Next, create architectural and structural drawings using the Revit. The outcome of this study, BIM is developed from architecture and structure drawing using Revit software. Therefore, it may be inferred that using Revit software to create BIM saves more time for maintenance purpose.

Downloads

Download data is not yet available.

Author Biographies

Nur’Ain Idris, Department of Civil Engineering, Centre for Diploma Studies, Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, 84600 Muar, Johor, Malaysia

ainidris@uthm.edu.my

Muhammad Arif Muhammad Hafiz Saw, Department of Civil Engineering, Centre for Diploma Studies, Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, 84600 Muar, Johor, Malaysia

arif030116@gmail.com

Nurkhairinna Adilah Mohamad Hairi, Department of Civil Engineering, Centre for Diploma Studies, Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, 84600 Muar, Johor, Malaysia

khairinnaadilah@gmail.com

Ain Syazana Setia, Department of Civil Engineering, Centre for Diploma Studies, Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, 84600 Muar, Johor, Malaysia

ansyzna97@gmail.com

Hamidun Mohd Noh, Department of Construction Management, Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia, Parit Raja, 86400 Batu Pahat, Johor, Malaysia

hamidun@uthm.edu.my

Khairi Supar, Department of Civil Engineering, Centre for Diploma Studies, Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, 84600 Muar, Johor, Malaysia

khairis@uthm.edu.my

Noorul Hudai Abdullah, Department of Civil Engineering, Centre for Diploma Studies, Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, 84600 Muar, Johor, Malaysia

noorul@uthm.edu.my

Siti Masturah Rahman, Faculty of Civil Engineering and Built Environment, Universiti Tun Hussein Onn Malaysia, Parit Raja, 86400 Batu Pahat, Johor, Malaysia

masturahsiti1@gmail.com

Rahmita Sari Rafdinal, PS Construction Co. Ltd., Tokyo Shiodome Building, 1-9-1, Higashi Shimbashi, Minato-ku, 105-7365 Tokyo, Japan

s-ramita@psc.co.jp

Downloads

Published

2025-08-07

How to Cite

Idris, N. ., Muhammad Hafiz Saw, M. A., Mohamad Hairi, N. A., Setia, A. S., Mohd Noh, H., Supar, K., Abdullah, N. H., Rahman, S. M., & Rafdinal, R. S. (2025). Development of Building Information Modelling Model for Residential Housing in Enhancing the Maintenance Work. Journal of Advanced Research Design, 142(1), 136–151. https://doi.org/10.37934/ard.142.1.136151
سرور مجازی ایران Decentralized Exchange

Issue

Section

Articles

Most read articles by the same author(s)

فروشگاه اینترنتی