Analysing the Project Delay Causes and Improving Quality using Multi-Project Strategies

Authors

  • Nur Amirah Syahirah Azman Razak Faculty of Technology and Informatics, Universiti Teknologi Malaysia, Jalan Sultan Yahya Petra, 54100 Kuala Lumpur, Malaysia
  • Faizir Ramlie Razak Faculty of Technology and Informatics, Universiti Teknologi Malaysia, Jalan Sultan Yahya Petra, 54100 Kuala Lumpur, Malaysia
  • Wan Zuki Azman Wan Muhamad Institute of Engineering Mathematics, Universiti Malaysia Perlis, Kampus Pauh Putra, 02660 Arau, Perlis, Malaysia
  • Mohd Yazid Abu Faculty of Manufacturing and Mechatronic Engineering Technology, Universiti Malaysia Pahang Al-Sultan Abdullah, 26600 Pekan, Pahang, Malaysia
  • Nolia Harudin Universiti Tenaga Nasional, 43000 Kajang, Selangor, Malaysia

DOI:

https://doi.org/10.37934/arbms.34.1.2334

Keywords:

project management, delay management, mitigation strategy

Abstract

Numerous reasons for project delays from the viewpoints of the client and the contractor have only been somewhat studied. The aim of this paper is to recognize the delays' underlying causes and issues ways to reduce them considering the progress of the project. Consequently, 106 contractor-side experts and 82 client-side experts in project management were the subjects of this study. The clients and contractors gave the same importance to factors like poor communications and governmental approvals in projects that were successful (had a time delay of less than 10%). Similar mitigating techniques including rigorous project monitoring, skill development training, and effective logistics planning were advised. When projects were unsuccessful (with a time delay of more than 10%), they displayed a wide range of behaviours.

Author Biographies

Nur Amirah Syahirah Azman, Razak Faculty of Technology and Informatics, Universiti Teknologi Malaysia, Jalan Sultan Yahya Petra, 54100 Kuala Lumpur, Malaysia

nur.amirah.syahirah@graduate.utm.my

Faizir Ramlie, Razak Faculty of Technology and Informatics, Universiti Teknologi Malaysia, Jalan Sultan Yahya Petra, 54100 Kuala Lumpur, Malaysia

faizir.kl@utm.my

Wan Zuki Azman Wan Muhamad, Institute of Engineering Mathematics, Universiti Malaysia Perlis, Kampus Pauh Putra, 02660 Arau, Perlis, Malaysia

wanzuki@unimap.edu.my

Mohd Yazid Abu, Faculty of Manufacturing and Mechatronic Engineering Technology, Universiti Malaysia Pahang Al-Sultan Abdullah, 26600 Pekan, Pahang, Malaysia

myazid@umpsa.edu.my

Nolia Harudin, Universiti Tenaga Nasional, 43000 Kajang, Selangor, Malaysia

Nolia@uniten.edu.my

Published

2024-02-21

How to Cite

Syahirah Azman, N. A., Ramlie, F., Wan Muhamad, W. Z. A., Abu, M. Y., & Harudin, N. (2024). Analysing the Project Delay Causes and Improving Quality using Multi-Project Strategies. Journal of Advanced Research in Business and Management Studies, 34(1), 23–34. https://doi.org/10.37934/arbms.34.1.2334
سرور مجازی ایران Decentralized Exchange

Issue

Section

Management studies
فروشگاه اینترنتی