Effect of Time Overruns on Apartment Building among Kuantan Malaysian Construction Industries

Authors

  • Nur A'shirah Mohd Azman Faculty Industrial of Management, Universiti Malaysia Pahang, Lebuhraya Tun Razak 26300 Gambang Kuantan, Pahang Darul Makmur, Malaysia
  • Adekunle Qudus Adeleke Faculty Industrial of Management, Universiti Malaysia Pahang, Lebuhraya Tun Razak 26300 Gambang Kuantan, Pahang Darul Makmur, Malaysia

Keywords:

delay, time overruns, apartment building, construction industries, Malaysia

Abstract

This paper assessed the effect of time overruns on apartment building among Kuantan Malaysian construction industries. A survey was conducted among 10 construction industries in Kuantan Pahang. Using proportionate stratified random sampling, out of which 10 questionnaires were distributed for data analysis. Using five point Likert scale categories from previous studies, statistical analysis affirmed a significant positive relationship between time overruns and apartment building among Kuantan Malaysian construction industries.

Downloads

Published

2020-12-08

How to Cite

Mohd Azman, N. A. ., & Adeleke, A. Q. . (2020). Effect of Time Overruns on Apartment Building among Kuantan Malaysian Construction Industries. Journal of Advanced Research in Applied Sciences and Engineering Technology, 10(1), 41–47. Retrieved from https://akademiabaru.com/submit/index.php/araset/article/view/1946